Client | Loughshore Autos Ltd
Project
Complete Plumbing, Heating & Mechanical Services – 15 New Build Apartments
Location
County Tyrone, Northern Ireland
Project Overview
Proline Mechanical was appointed to deliver the complete plumbing and heating installation for a new development of 15 rental apartments in rural County Tyrone.
The project involved the installation of all plumbing, heating, waste, soil pipework and sanitary ware throughout the development, together with the design and installation of a centralised water services plant room.
With 15 individual apartments to service, the project required careful planning and coordination to ensure that each property received a reliable supply of hot and cold water, effective heating and fully compliant waste and drainage systems.
The 18-month project brought together a range of mechanical services and required Proline Mechanical to work closely with the building control team, engineers, architects and other trades throughout the construction programme.
The Challenge
Delivering mechanical services within a multi-unit residential development requires considerably more coordination than a standard domestic plumbing project.
The plumbing and heating systems needed to be designed and installed around the building layout and wider construction programme, while allowing other trades to progress their work without unnecessary delays.
Proline Mechanical worked closely with the project’s building control officers, engineers, architects and other contractors throughout the 18-month programme. Regular coordination was essential to ensure that the installation remained aligned with the client’s specification and that any requirements arising during construction could be addressed efficiently.
Another important consideration was the water supply for the completed development.
With 15 apartments sharing a centralised water services arrangement, the system needed to provide sufficient stored water capacity and adequate pressure to meet demand, including periods when multiple apartments could be using water simultaneously.
This required a properly designed plant room incorporating suitable water storage and a correctly sized booster pump system.
Complete Plumbing & Heating Installation
Proline Mechanical was responsible for the design, supply and installation of the project’s main plumbing and heating systems.
The scope of work included:
- Underfloor heating system design and installation
- Domestic hot-water plumbing
- Domestic cold-water plumbing
- Waste pipework
- Soil pipe installation
- Sanitary ware installation
- Mechanical pipework
- Centralised water services plant room
- Stored water capacity
- Booster pump system
The result was a complete mechanical and plumbing installation serving all 15 apartments.
By managing the plumbing and heating package from design through to installation, Proline Mechanical was able to coordinate the individual systems as part of one overall mechanical services package.
Underfloor Heating Installation
Underfloor heating formed a key part of the heating installation within the apartments.
Proline Mechanical designed and installed the underfloor heating system as part of the wider mechanical package, coordinating the installation with the building construction and other trades.
Underfloor heating requires careful planning during a new-build project, particularly where floor construction, insulation and finished floor levels need to be considered alongside pipework layouts.
The installation was coordinated throughout the build to ensure that the heating system was correctly positioned and ready for the subsequent stages of construction.
Centralised Water Services Plant Room
One of the more technically significant aspects of the project was the design and installation of the centralised water services plant room serving the 15 apartments.
Rather than treating each apartment as an isolated installation, the centralised system needed to be designed around the combined requirements of the development.
Proline Mechanical incorporated sufficient stored water capacity together with a suitably sized booster pump system to maintain an effective water supply during periods of high demand.
The system was designed to provide the required capacity and pressure for the development while keeping the mechanical services organised within a dedicated plant room.
This element of the project demonstrates Proline Mechanical’s experience in designing practical commercial plumbing and mechanical water systems for multi-unit developments.
Coordinating a Complex New-Build Project
Throughout the 18-month construction programme, Proline Mechanical worked alongside the wider project team to keep the mechanical installation progressing in line with the construction schedule.
Coordination with architects, engineers, building control and other trades was particularly important as the project progressed through different construction stages.
The team had to ensure that plumbing and mechanical pipework was installed at the appropriate stages, allowing other trades to complete their work while maintaining access to areas where mechanical services were still required.
This collaborative approach helped minimise disruption and ensured that the installation remained consistent with the agreed specification.
The Result
Proline Mechanical successfully delivered the complete plumbing and heating package for all 15 new-build rental apartments, completing the specified works within the agreed 18-month project programme.
The installation included the full range of plumbing services, underfloor heating, waste and soil pipework, sanitary ware and the centralised water services plant room.
The completed system met the client’s specification and was delivered successfully through close coordination with the project’s engineers, architects, building control team and other trades.
Experienced Mechanical Contractor in County Tyrone
The Loughshore Autos development demonstrates Proline Mechanical’s ability to deliver comprehensive mechanical and plumbing packages for multi-unit residential developments.
From underfloor heating installation and domestic plumbing to centralised water services, booster pump systems and waste pipework, the company provides a complete mechanical installation service for new-build projects across Northern Ireland.
As an established plumbing contractor in County Tyrone and experienced mechanical contractor in Northern Ireland, Proline Mechanical works with developers, main contractors and construction teams to deliver reliable mechanical services from initial design through to completion.
For developers requiring a commercial plumbing contractor in Northern Ireland, a mechanical pipework contractor or a subcontract mechanical contractor for a new-build development, Proline Mechanical can provide the experience and practical expertise required to keep the project moving.
Looking for a Mechanical Contractor for a New-Build Development?
Proline Mechanical delivers commercial plumbing, heating, mechanical pipework and building services for residential, commercial and industrial developments throughout Northern Ireland and Ireland.
Contact the Proline Mechanical team to discuss your upcoming project and mechanical installation requirements.